Urgent and Recurring Items

Author: Mark Forster | Created: 2010-02-2 10:25 | Last Activity: 2010-02-4 9:44

Original Post

2010-02-2 10:25
Some people are worried about putting urgent or frequently recurring items on the list at the 1-month and then 1-week points. It's important to realise that the dates in the diary do not refer to the date something should be actioned but are a means of purging tasks which have not been dealt with.

Since all the diary pages are treated as one long list, all parts of the list are able to be accessed at any one time. So an urgent item is just as likely to get done on the page for Mar 2 as on the page for Feb 2.

As an illustration, I actioned the task "Comments" twenty-one times over the past three days, and each time was in accordance with the rules.

And my current task "Write comment on urgent tasks" was put on the Mar 2 page by me earlier this morning.

The next task on the Mar 2 page? "Write comment on US/UK use of "calendar" etc."

Reply by Mike

2010-02-2 11:30
Mark,

I got that idea right off, but there is a POWERFUL psychological factor ... if it is on the March 2nd page it does not need to be worked on until March 2nd. This is going to be an uphill battle for some, including myself. I'm not sure what to do to reprogram that attitude.

Reply by Margaret1

2010-02-2 11:56
Hi, Mark - what a surpise I got when I opened your site after being out all day yesterday and discovered your blog about testing out the new system. How exciting! The first thing I did this morning was to read the instructions, and I immediately got started I was just about at the end of my AF4 notebook, and had a new one ready to use, so I've started it by entering dates from 8 February till 2 March. Then on the 2 March date my first two tasks were entered: "Read all blog and forum comments since yesterday" and "Think about how to handle previous AF4 list", and there I was, up and running!

It's taken me some time to read through all the comments on the blog and discussion forum. I think the system is great, and I'm sure you won't regret throwing it open to comments, to help you refine it further. I understand that the system will have a 1-month start-up time to get up to speed.

Here are my thoughts so far, and I hope you'll correct me if there's anything amiss. (Just as I was previewing this post, I saw Mike's above, and that's exactly what I think, and hope I have addressed below).

I think there are three key points that should be hammered into our heads:

(1) The active list starts at today's date and ends where you've written any new tasks that occur to you today (on the page with the same date of the following month).

(2) You work the active list in the same way as previously in Autofocus, checking each task to see if it stands out as ready to be worked on. This means that every single task on the list is available to be worked on right this instant, whether it appears on the page with today's date, or on the page with a date one month from today, or on any page in between. So an urgent task which just appeared today, and needs to be worked on today, can be actioned by moving through the list ignoring all the items before it. Once it's been actioned, you carry cycling through each item on the list again. Some peoplle may only cycle through the list once every few days, but most people will have urgent tasks on their list, and may cycle through the list many times a day.

(3) When you open your notebook at today's date, the list of items will be composed of:

(a) crossed-off tasks which were added either 1 month ago (and have been crossed off because they were worked on since they were added), or 1 week ago (and have been crossed off because they were worked on since they were added)
(b) open tasks which were added 1 month ago (and have not been worked on since, so if you don't work on them today they get dismissed),
(c) open tasks which were added 1 week ago (and have not been worked on since, so if you don't work on them today they get dismissed).

Best wishes.

Reply by Seraphim

2010-02-2 15:25
Mark wrote:
>>>Since all the diary pages are treated as one long list, all parts of the list are able to be accessed at any one time. So an urgent item is just as likely to get done on the page for Mar 2 as on the page for Feb 2.<<<


I suppose that depends significantly on one's manner of processing the list. For myself, I am treating it as a series of closed list, and read through them AF1-style (start each day on "today", come to new page, scan through it, consider carefully each item, take action on whatever stands out, keep cycling the page till nothing stands out).

For now, it works just fine. But do you think that will continue to work just as effectively, after you've got tasks spread across 30 pages? (i.e., after this program has been going for a full month)

I'm trying it "as written" for now, but I share Mike's concern.

Reply by Seraphim

2010-02-2 15:28
Let me clarify my last post.

I realize that I could "jump ahead" at any time and go to the last page to see what urgent things are waiting for me there.

But potentially, there could be urgent things scattered all across 30 pages, but no automated way for me to see those items in time if I happen to get bogged down with a few pressing projects or have been away from my list for a few days.

By putting items that must be done today, on today's list (e.g., "below the line", DIT-style), and putting items that must be started by February 20th on the 2/20 page, then it seems it would helps automate that so you don't have to go "searching" for urgent tasks.

Reply by Mark Forster

2010-02-2 18:16
Mike:

<< there is a POWERFUL psychological factor ... if it is on the March 2nd page it does not need to be worked on until March 2nd. This is going to be an uphill battle for some, including myself. I'm not sure what to do to reprogram that attitude. >>

I think that is more of a theoretical problem than one in reality. People will get used to it quite quickly because ALL tasks get entered for the first time at the 1-month point. So if I put "Eat slice of delicious chocolate cake" on the list for the first time today, I'm not going to be waiting around for a month to action it!

Reply by Mark Forster

2010-02-2 18:20
Margaret1:

Yes, I think you've got it!

Reply by Mark Forster

2010-02-2 18:24
Seraphim:

<< I am treating it as a series of closed list, and read through them AF1-style (start each day on "today", come to new page, scan through it, consider carefully each item, take action on whatever stands out, keep cycling the page till nothing stands out). >>

I don't recommend that method for this system. It will slow it down too much. My recommended method is to treat it all as one list and to cycle through the whole thing in one direction only.

Reply by Mark Forster

2010-02-2 18:27
Seraphim:

<< I realize that I could "jump ahead" at any time and go to the last page to see what urgent things are waiting for me there.

<< But... >>

This should not be a concern if you use the method I recommend in my above post.

Reply by nuntym

2010-02-2 20:51
<>

And that is exactly why this system is perfect for electronic PIM systems, as it is easy in such to put all tasks from multiple dates into one long list, ordered by date.

Thank you very much, Mark!

Reply by Mark Forster

2010-02-2 23:47
nuntym:

The only thing that I have against electronic implementation is that the diary/calendar provides very strong visual motivation.

Reply by Seraphim

2010-02-3 0:03
Mark wrote:
<<>>

OK, thanks, good to know! I will try that. This is basically the same as the way you recommended processing the Open List in AF4, right?

Thanks!

Reply by Wooba

2010-02-3 0:07
Mark,

Please can you clarify whether this is one long list like in AF4, or pages, like in AF1. You suggest the latter on the Ping Pong thread.

Thanks,

Reply by Mark Forster

2010-02-3 0:19
Wooba:

<< Please can you clarify whether this is one long list like in AF4, or pages, like in AF1. >>

One long list which you cycle through in one direction only. You read through all 31 potential pages one after another just as if you were reading a book. That's not actually the same as either AF4 or AF1.

<< You suggest the latter on the Ping Pong thread. >>

I do? I can't find it.

Reply by Wooba

2010-02-3 1:08
Mark,

It was in a reply to Frank, but I may have misunderstood:

"DIT2/AF5 consists of a series of closed lists (and two open lists), each of which has a different amount of time pressure on it.

"So for instance my list dated Feb 6 has one remaining item on it (out of 36 originally). It has five days left in which I can action it. My list dated 7 Feb has seven remaining items (out of 46) and six days left.

"That is a powerful closed list effect.In fact my impression is that it is even more powerful than the closed list effect in AF1."

I very much like and benefit from the AF1 closed list effect, and would like something similar in AF5. I am not very productive with a very long list. Any ideas for me?

Reply by Mark Forster

2010-02-3 8:54
Wooba:

I was referring to the fact that there is a powerful closed list effect in DIT2/AF5, even though one treats it as one long list.

The only way you can really experience this is by trying it out.

Reply by Christian G.

2010-02-3 14:04
Seraphim wrote: there is a POWERFUL psychological factor ... if it is on the March 2nd page it does not need to be worked on until March 2nd. This is going to be an uphill battle for some, including myself. I'm not sure what to do to reprogram that attitude.

Mark replied: I think that is more of a theoretical problem than one in reality. People will get used to it quite quickly because ALL tasks get entered for the first time at the 1-month point. So if I put "Eat slice of delicious chocolate cake" on the list for the first time today, I'm not going to be waiting around for a month to action it!

My comment: Even if I have learned from past experiences with AF1-4 that I can trust Marks recommendations, I dare to disagree here (esp. since the system is in its beta phase): I feel a specific pressure with all unactioned items on today’s page. These are tasks which need to be done today or never. Same applies to tasks with a deadline. They have to be finished by that day or never (sort of, depends on the person who set the deadline). Thus I would write those tasks on the deadline date’s page (or in one month time whatever is earlier).

Reply by MartyH

2010-02-3 14:16
I agree about tasks with a deadline. I just can't see myself adding them on a date AFTER they are due.

Once they have been worked on, they still have a deadline, but they would get reentered a week later if that is less than the deadline. If you work on anything, you need to work on it again within a week or it dies. That part doesn't bother me. (I add the deadline in square brackets at the end of the task so I know when it must be complete.)

Reply by Rainer

2010-02-3 14:59
Just a thought:
Maybe one could use the diary/calendar in another way, having the appointments/meetings plus the real deadlines written in the upper part of the page, then drawing a horizontal line, below that line leaving same space for the same-day-urgent tasks, then drawing another horizontal line, and entering the DWM (DIT2AF5) tasks below the second horizontal line (assuming there is enough space, or maybe using a spread of two pages for one single day).

Reply by Mark Forster

2010-02-3 15:43
I can assure all those who are planning to change the rules without even trying them that they really do work.

I did spend some considerable time working on this and tried many things out, including exactly what you are proposing. There was only one thing wrong with it - it didn't work.

The advantage of having only two "entry points" is that every page apart from those two days is a closed list. If you start adding things to them they stop being closed lists and you lose the big psychological advantage this system has.

Reply by MartyH

2010-02-4 2:18
Mark,

Thanks for the explanation of why we shouldn't add things anywhere except those two pages. That understanding will help me get over my resistance.

Reply by Will

2010-02-4 6:55
To get the "page" effect in outlook tasks, group by due date and collapse the list. This gives a list of dates with the number of tasks on each date.

If you filter for open tasks, you get the number of open tasks.

Reply by Chris Y

2010-02-4 6:58
The huge attraction for me is that you go back to using a diary, as DIT did. I love diaries, and the notebook AF just didn't have that draw. Hoping as always that I shall be transforming my life. Mark, could you please concentrate next on a system that will actually DO the ironing for me, instead of just writing it down?

Reply by Nicole

2010-02-4 9:44
I'm also interested in that ironing system :-)